About us
About us
Registered Name | DAISHO DENSHI CO., LTD. |
---|---|
Establishment | September 12, 1968 |
Head Office | 2-16-5 Den-en Chofu, Ohta, Tokyo, Japan 145-0071 TEL: +81-3-3722-2151 |
Capital | JPY 731 Million |
President | Shozo Sugaya |
Main Products |
|
Employees | 921 (As of March 31, 2024) |
Annual Sales | JPY 24,701 Million (As of Mar.2024) |
Chairman | Naotoshi Shinozaki |
---|---|
President | Shozo Sugaya |
Executive Vice President | Hiroyuki Noguchi |
Senior Managing Director |
Ikuo Eda |
Managing Director | Toshiyuki Anno |
Director | Mitsuhiro Yamaguchi Akihiro Yanami Kazumoto Kimura Tadashi Sugiyama |
Auditor | Koichi Sekiyama |
---|
Corporate Officer | Naokatsu Nojiri Yukimasa Ueda Yuuichi Konno |
---|
As of april 1, 2023
1968 | DAISHO DENSHI CO., LTD. established. |
---|---|
1969 | Operation of Tochigi Factory started. CC-4 process mass production succeeded first time in Japan. |
1983 | Kashiwa Sales Office opened. |
1986 | Operation of Iwate 2nd Factory started. |
1989 | All production lines at Iwate Plant in full operation. |
1990 | DAISHO DENSHI AMERICA INC established. |
1992 | Operation of Iwate 1st Factory started. |
1995 | Iwate Plant obtained ISO9002. Tochigi Plant obtained ISO9002. DAISHO DENSHI(H.K) LIMITED established. |
1996 | DAISHO DENSHI Design Office opened in Philippine. Operation of production lines for semiconductor Package boards at Tochigi Plant started. |
1998 | Iwate Plant obtained ISO14001. |
2001 | Construction of the 3rd Iwate Factory completed. Solar Co-generation System operated in Iwate Plant. Tochigi Plant obtained ISO14001. DAISHO MICROLINE LIMITED invested capital. |
2002 | Flex-rigid multy layer board mass-production started at Iwate Plant. |
2003 | Transition to design headquarters ISO9001:2000 edition completed. Transition to Tochigi/Iwate Plants added to Saled Head ISO9001:2000 edition completed. Tochigi 2nd Plant obtained ISO14001. |
2004 | LINEARWORKS CORP.(Philippines Design Center) established. |
2005 | Transition to Iwate Plant ISO14001:2004. Transition to Tochigi Plant ISO14001:2004. |
2006 | New factory for Semiconductor package board completed in Tochigi plant location. |
2007 | Tochigi 2nd Plant Metalworking Factory completed. |
2008 | LINEARWORKS CORP start operation as the substrate inspection plant in Philippine. Dormitory for Iwate Plant singles "Yusho" completed. |
2010 | Tochigi Plant/Iwate Plant/Sales department/Design department completed authorized integration for the multi-site ISO9001:2008 certification. |
2011 | Tochigi No.2 Plant obtained ISO9001:2008. |
2013 | LINEAR WORKS CORP., an aggregation of Design Center to the substrate inspection factory. |
2017 | LINEARWORKS CORP. (Philippines) started operation of tape & reel department business. |
2018 |
ISO 9001: 2015 version, ISO 14001: 2015 version company-wide certification (multi-site) completion. |
2019 | DAISHO DENSHI AMERICA INC obtained ISO9001:2015. |
2023 | New factory for Lamination press process completed in Iwate plant location. |